Teeside Biomass Facility, Teeside, England

Client
Lagan Specialist Contracting / Doran consulting / BWV
Location
Teeside, England
Procurement
Design and Build
Stage
Complete

The practice was retained with engineers, Doran Consulting, by contractor Lagan Construction under a D&B contract, to complete the detail design and delivery of an exemplar design for a major Biomass energy facility in Teeside (operated by BMV).

Teeside Biomass Facility Model

The use of BIM modelling was critical in ensuring not only effective coordination of structure, services and fabric, but also in integrating the differing pieces of machinery and equipment associated with the process that sit inside the building.

Teeside Biomass Facility CGI
Teeside Biomass Facility BIM Model